Natron-Hayat Maglaj 25 MW – control and protection system testing after turbine inspection
TE Plomin 210 MW – defining the minimal pressure in steam turbine control oil system
ELEM Skopje 15 MW – analyzing the cause of steam turbine trip
TE Plomin 210 MW – statical and dynamical testing of steam tubine control system and reconstruction of MP linear actuator position measurement
TE-TO Osijek 45 MW – statical and dynamical testing of steam turbine control and protection system before and after turbine inspection
TE-TO Ljubljana 42 MW (block 2) and 50 MW (block 3) – statical and dynamical testing of steam turbine control and protection system; parameterization and testing of spare overspeed protection system Bently-Nevada (ADAPT)
Petrokemija Kutina 35 MW – instrumentation delivery and upgrade of electronic controller for new admission of 4 bar steam into low pressure part of turbine
Arcelor-Mittal Zenica 25 MW – repair of hydraulic linear actuator Siemens
Arcelor-Mittal Zenica 7 MW – delivery of equipment and computer program for remote monitoring of Woodward 505 governor
TE Kolubara 110 MW – testing and adjustment of hydraulic actuators for control and trip valves
“Viro” Virovitica 8,5 MW – upgrade of electronic controller of backpressure turbine because of new absolute casing extension and rotor to casing relative extension measurement
Rafinerija Pančevo 11,3 MW – dynamical testing of steam turbine control system with Woodward 505 governor and Voith I/P converters
TE-TO Zagreb 66 MW – adjustment of three probes for axial displacement measurement of steam turbine rotor (Bently-Nevada 3500 system)
EL-TO Zagreb 30 MW – inspection and calibration of vibration monitoring system Bently-Nevada 3500
EL-TO Zagreb 30 MW – statical and dynamical testing of steam turbine control and protection system before and after turbine inspection
TE-TO Zagreb 37 MW – inspection and calibration of vibration monitoring system Bently-Nevada 3500, vibration measurement after turbine overhaul
TE-TO Zagreb 37 MW – statical and dynamical testing of steam turbine control and protection system before and after turbine overhaul
KTE Jertovec, PT2 30 MW – vibration measurement after turbine overhaul and rotor balancing on site
Kutina 35 MW – statical and dynamical testing of steam turbine control and protection system before and after turbine overhaul
Natron-Hayat Maglaj 25 MW – programming and commissioning of new controller for double extraction steam turbine (PLC Siemens)
TE-TO Osijek 45 MW – preventive inspection of control and protection system, vibration measurement on steam turbine and auxiliary equipment (pumps, fans)
Kneževo 880 kW – commissioning of steam turbine and generator set in biomass plant, testing of control and protection system and vibration measurement
TE Plomin 210 MW – preventive inspection of control and protection system, vibration measurement on turbine and auxiliary equipment
TE-TO Zagreb, water heating boilers VK3, VK4, VK5 i VK6 – vibration measurement on fans for fresh air and for smoke gases recirculation
Natron-Hayat Maglaj 25 MW – testing of control and protection system before and after turbine inspection; calibration of vibration monitoring system Bently-Nevada 3500
TE Plomin 210 MW – reconstruction of turbine axial displacement measurement system (Bently-Nevada)
Kutina 210 kW – testing of hydraulic speed governor on test station
MSK Kikinda 3,11 MW – vibration measurement on turbocompressor before and after overhaul
TE Kosovo 210 MW – statical testing and adjustment of steam turbine control system before and after overhaul
BE-TO Kircek Ljubešćica – vibration measurement on turbogenerator
TE-TO Osijek 45 MW – reconstruction of HP and LP servomotor and automatisation of turbine draining valves with AUMA drives
BE-TO Slavonija Slavonski Brod – vibration measurement on cooling fans for steam turbine air condenser
TE Kakanj 230 MW (block 7) – service, calibration and adjustment of Bently-Nevada 3500 vibration monitoring system
TE Tuzla 210 MW – statical testing of steam turbine hydraulic control system before and after overhaul
TE-TO Ljubljana 42 MW (block 1) – analysis of steam turbine oil system, testing of oil pump and measurement of oil flow in lube and control oil system with ultrasonic flowmeter
Toplana Zenica – service and calibration of vibration monitoring systems on turbocompressor 18 MW and turbogenerator 25 MW, control system testing before and after overhaul, replacement of operation station with SCADA system WinCC on turbine 25 MW
BE-TO Osijek – vibration measurement and analysis of cause of vibrations on turbine 3,1 MW
TE Plomin 210 MW – reconstruction of four actuators for HP turbine, delivery of gland steam fan and parts for electronic control of gland steam condensate
Natron-Hayat Maglaj 25 MW – installation of 2oo3 hydraulic trip-block instead of one Herion electromagnetic valve and mechanical trip device, installation of electronic 2003 overspeed device and electronic condensate level control system
Petrokemija Kutina 35 MW – complete replacement of all cables in measuring and control system on turbine, new control cabinet delivery and installation
Petrokemija Kutina, Ammonia and Urea Plant – control system modernisation on four steam turbines (2×2,04 MW Jugoturbina driving feed water pumps, turbocompressor 8 MW Nuovo Pignone, turbocompressor 26 MW Siemens), all based on Siemens S7-400 PLC